Streetscape work today!

The contractor plans final bacteria tests today on the new water line on Walhalla’s Main Street—on the south side of the block from College to Catherine streets.  Meantime, they are “sawing out” the concrete.  It’s a waiting game on the block from Tugaloo to College streets.  According to Hutch ‘N Son, waiting for Duke Energy to re-schedule the changeover at the Bantam Chef and still waiting for the engineer to supply the new grades to allow for new sidewalk construction.