Today’s Streetscape work

The contractor will continue electrical conduit work today on the north side of Walhalla’s Main Street.  Hutch ‘N Son expects to move to the block today from College to Tugaloo streets.  Crews also plan tip island sidewalk work on the south side of Main Street. Electrical work will require the closing of College Street on the north side, probably tomorrow.